Home | Inquiry | Contact Us | Site map | Login
Projects Categories
Solar Power Plant
Cement Plant
Steel Plant
Power Plant
Sewage Treatment Plant
Packaging Plant
Institutional Work
Gas Compressor Stations
Industrial Projects
Infrastructure Work
Food Industry
Residential & Commercial Work
Earth Work
Inquiry Form
 
 
 
 
 
 
 
CAPTCHA Image
 
 
 
Photo Gallery
 
Solar Plant Concreting Work (2).
Solar Plant Pile Foundations.
Oxygen Plant.
Cement Project under Construction (36).
Air Port Hanger Back View.
Road Work_Utility.
College Building Hanging Plane.
Industrial Heavy Flooring.
RCC Silo Stagging work.
Solar Plant Module Slab Foundation.
Steel Plant Construction 2.
Solar Plant Finished Pile Foundation.
Industrial Admin Building Corridor.
Hexagon Pattern.
Road Work _GSB.
Steel Plant Construction 4.
Solar Plant False Flooring and Ceiling Work.
RCC Kiln Pier.
Cement Plant (2).
College Night Life.
Cement Project under Construction (48).
Cement Mill House and Packing Plant.
Mithapur Solar Plant.
Solar Training at GERMI_Group Pic.
Solar Plant Finished Pile Foundations.
Efluent Treatment Plant.
RCC Silo Base Slab.
Solar Plant Slab Foundation Under Construction.
Cement Project under Construction (25).
RCC Open and Shaded Stack Yard (2).
College Building Main Campus Waiting Room.
Factory Building GSB and Earth Work.
College Building Main Campus Side View.
PreHeater Tower Column Foundations.
Solar Plant Slab Foundations (3).
Pre Stressed High Rise Building Foundation PCC and Reinforcement Work.
Bird's Eye View of Mehsana Hangar.
College Building Main Campus Interior Lab 3.
Stagging Material.
PreHeater Tower Footing.
Gujarat NRE Cock Open Stakyard Flooring.
College Building Main Campus Interior Lab 2.
Cement Silo Wall.
Concrete activity for Control Building at Solar Plant.
Solar Plant Finished Slab Foundations.
Workshop Building.
College Library.
Fly Ash Silo Bottom Slab and Columns.
College Builing.
Solar Panel Installation Training At GERMI.
Food Factory Building.
Industrial Building GSB and Earth Work.
PreHeater Tower Foundation Shuttering work.
Cement Project under Construction (44).
College Building Main Campus Interior Lab 4.
College Building Workshop 2.
RCC Open Stack Yard.
Preheater Raft Footing.
College Building Main Campus Class Room 1.
Air Strip Runway.
Air Port Hanger Building.
Solar Plant Concreting Work.
Hydro Test Plant (2).
College Campus Land Scape.
College Building Main Campus 2.
College Building Workshop.
Cement Project under Construction (15).
Industrial Building Interior (8).
RCC Silo Initial Stage.
Cement Project under Construction (5).
College Building Main Campus Back Yard and Display Unit.
Cement Project under Construction (4).
Airport Hanger Apron Runway.
Cement Project under Construction (29).
Solar Plant False Ceiling Work.
Solar Plant Structure and Module Installation.
RCC Silo Bottom Slab Reinforcement Work.
Solar Plant Under Construction Full View.
RCC Silo Footing.
Solar Plant (1).
Cement Project under Construction (10).
Industrial Buiilding Heavy Duty Floor.
Cement Project under Construction (42).
Earth Work (4).
Cement Silo Footing.
Factory Entrance (2).
PreHeater Tower Footing 1.
Cement Project under Construction (37).
Air Port RCC Taxi Lane.
College Building Laboratory Unit 1.
Inside View of Silo.
High Rise Building Foundation.
Machinery 6 (1).
Cement Project under Construction (28).
Cement Project under Construction (34).
Auditorium.
Cement Project under Construction (2).
Flyash Silo Bottom Slab.
Solar Plant (2).
Factory Shed and Road Work.
Solar Plant Reinforcement Cages.
Muhurt At Solar Plant.
College Building Laboratory Unit 4.
Control Room and Pipe Rack.
Solar Plant Finished Pile Foundations (2).
Effluent Treatment Plant (1).
College Building Main Campus (2).
Air Port Hanger RCC Floor.
Gym.
Cement Project under Construction (9).
Industy Power Unit.
Machinery 99.
Pile Drilling and Concerting Work at Solar Plant.
Solar Plant Slab Foundations (4).
Air Port Hanger Floor 2.
Solar Plant Taking Shape (1).
Air Port RCC Apron 1.
GSB Work.
Fencing Work at Solar Plant.
Machinery 7.
Solar Module Slab Foundation 1.
Cement Project under Construction (49).
Roof Top Solar System At GERMI Training.
Solar Plant Slab Foundations for PV Modules.
College Main Gate 2.
Industrial Factory under construction.
Industrial Building.
Heavy Foundation Concreting Activity.
Cement Project under Construction (23).
Deshuttering of High Rise Heavy Slab.
College Building Workshop and display unit.
Industrial RCC Tank.
PreHeater Tower RCC Silo Initial Stages.
Pile Foundation for Solar Power Plant.
Earth Work (6).
Cement Project under Construction (41).
Cement Project under Construction (47).
Cement Project under Construction (21).
Solar Plant RCC Slab Foundations.
PreHeater Tower Footing 2.
Solar Plant.
Solar Plant CSS Foundations.
Preheater Tower Column Foundation.
Sky Light in Main Campus Building.
Parking (2).
PreHeater Tower Foundations.
Parking (1).
Silo Fabrication Work.
Heavy Slab Stagging and Shuttering Work.
Bike Assemble Buildin and Paint Booth.
College Display Unit 1.
CCR Building.
Gantry Girder and Columns.
Cement Project under Construction (40).
Solar Plant (3).
Solar Plant Pile Foundations Under Construction.
Machinery 6 (3).
Solar Plant Slab Foundations (2).
Cement Project under Construction (30).
Air Port RCC Apron 4.
College Building Laboratory Unit 3.
Air Port Apron 5.
Food Insutry Factory Building.
RCC Silo Slip Form.
Industrial Building Interior.
Steel Plant.
Cement Plant (4).
Solar Plant Pile Foundation under Construction (2).
Solar Plant Finished Pile Foundations (4).
College Building Main Campus Class Room 2.
Cement Project under Construction (7).
College Main Gate.
College Building Workshop Shed.
Solar Plant Control Room Slab Concreting.
Earth Work (7).
Work Shop Building.
College Campus.
Canteen (3).
Cement Project under Construction (19).
Cement Silo Under Construction.
Clinker Stockpile.
College Building Main Campus Under Construction.
Cement Project under Construction (43).
CCR Building and PreHeater Tower.
Silo Bottom Slab and Slip Form Work.
Solar Plant CSS Foundation and Control Room.
Solar Plant Taking Shape (2).
RCC Silo Starter Work.
Paint Booth Industruial Unit.
Earth Work (3).
Solar Plant Slab Foundations (1).
Laboratory Class Room.
Cement Project under Construction (14).
College Campus Water Body.
Cement Project under Construction (46).
Cement Project under Construction (35).
Air Port Hanger.
Weigh Bridge under Silo.
Solar Plant Fencing Work.
PreHeater Tower Foundation Reinforcement Work.
High Rise Building Foundation Concreting Activity (2).
Solar Plant Module Slab Type Foundation.
Effluent Treatment Plant (4).
PreHeater Tower Foundation Work.
RCC Open and Shaded Stack Yard (3).
Industrial Buildings Internal Shutters.
High Rise Building Foundation Concreting Activity.
Air Port RCC Apron 2.
Computer Laboratory.
Solar Plant Finished Slab Foundations (2).
Solar Plant Switch Yard Foundation.
Cement Project under Construction (22).
Prestressed High Rise Building Foundation (2).
Food Factory Building Work.
Solar Plant Foundations for PV Panels.
Industrial Shed Work.
Slip form Shuttering.
College Main Gate and Landscape Circle.
Kiln Pier and PreHeater Tower.
Silo Pumping_Concrete Activity.
Industy Public Toilet.
Industrial Building Heavy Duty Vaccume Dewatered Trimix Factory Floor.
Food Factory Flooring Work.
Industrial Building Interior (11).
College Building Main Campus Interior Lab.
Fencing Work at solar plant (2).
College Building Main Campus Spiral Stair Exposed.
Canteen (5).
Cement Plant.
Cement Mill Column Foundation.
Solar Plant Full View.
Canteen (4).
Cement Project under Construction (31).
Making of Shuttering.
Kiln Pier Foundation (2).
Factory Building Gantry Girder Columns and Pockets.
Solar Plant Structure and Module Installation 1.
Air Port Apron (Parking).
Auditorium Stage (2).
Hostel Buildings Over Head Water Tank.
Solar Plant Pile Foundation Under Construction.
Control Room.
Industy Public Toilet (2).
Machinery 2.
College Display Unit 2.
College Canteen.
College Building Main Campus Interior 5.
Industrial Building Interior (6).
College Building Main Campus Skyline.
College Main Gate Parking and Landscape.
RCC Silo Slab Reinforcement.
Factory Building Vaccum Dewatered Trimix Floor.
Machinery.
ZZZ.
Canteen (1).
Strom Drain HT Line Water Line Sewerage Line and Other Utilities.
Solar Plant Control Room RCC Work.
Solar Plant Under Construction.
Water Network Junction.
Auditorium Stage.
Earth Work (8).
College Building Main Campus Interior.
Slipform Shuttering.
Preheater Tower Column Concreting.
College Library (2).
Plant And Machinery.
Road Work Sample.
Cement Silo Foundation.
Cement Project under Construction (1).
RCC Silo and Preheater Tower.
Food Factory Building Interior.
Canteen (2).
Steel Yard at Solar Plant.
Cement Project under Construction (16).
Industry building internal corridor.
Solar Plant Control Building Block Masonary.
Earth Work.
College Building Workshop and Display Unit 1.
Machinery 6 (2).
College Main Gate 1.
Earth Work (2).
Instititional Laboratory Building.
RCC Silo Slip Form Shuttering.
Cement Packing Plant.
Industrial Administration Building Corridor.
First Work.
FoothPath Sample.
Cement Project under Construction (38).
Kiln Pier Foundation.
Earth Work (1).
Industrial Building Interior (1).
PreHeater Tower and RCC Silo.
Cement Project under Construction (24).
High Rise Building Foundation Concreting Activity (3).
Machinery 3.
Auditorium (2).
Machinery (2).
Earth Work (5).
Industrial Building Internal Corridor.
College Building Main Campus 1.
Air Port RCC Apron 3.
Solar Plant False Flooring.
PreStressed High Rise Building Foundation.
Industrial Building Interior (4).
RCC Silo Slab _View_Fish Eye Lense.
Cement Plant (3).
Steel Plant Construction 3.
College Campus (2).
Cement Project under Construction (26).
Food Factory Building Flooring Work.
Residential Units.
Coal Stake Yard Flooring.
Solar Plant Modules.
Cement Project under Construction (45).
College Hostel Spiral Stair Case.
Plant and Machinery 1.
Heavy Foundation Reinforcement Work.
Cement Project under Construction (39).
Solar Plant CSS Foundation.
Cement Project under Construction (6).
Industrial Building Interior (3).
College Building Main Campus Interior Fire Brick Work.
Effluent Treatment Plant (2).
Institutional Building Plaster Work.
PreHeater Tower RCC Silo.
Surveying Instruments.
Sewage Treatment Plant.
Industrial Building (2).
Sky Light in Boy's Hostel.
College Building Laboratory Unit.
Industrial Building Interior (7).
Cement Plant 1.
High Rise Buildng Top Slab Stagging and Shuttering.
College Building Main Campus and Lab Building.
Cement Project under Construction (3).
Cement Project under Construction (27).
College Hostel Building.
Solar Module Slab Foundation 2.
Cement Silo and Cement Mill House.
Cement Project under Construction (17).
College Building Main Campus.
Road Work Storm Water Drain and Street Light Foundations.
Factory Entrance (1).
Industrial Building Interior (10).
Solar plant Finished Pile foundations (3).
Land Scape.
Air Port Apron 6.
Cement Project under Construction (32).
Solar Plant Erected PV Panels on Structures.
Cement Project under Construction (18).
Work Shop Shade Under Construction.
Steel Plant Construction 1.
PreHeater Tower.
Solar Plant Control Room.
Oxygen and Spongeyarn Plant.
Solar Plant Slab Foundations.
PreHeater Tower Foundation Reinforcement Work (2).
Girls Hostel and Water Tank.
 
 
 
  Home  |  About Us  |  Projects |  Services |  Contact Us  |  B-Con Profile  |  Inquiry  |  Photo Gallery  |  Sitemap  |  Login Designed By : Shah Net
  Bhagyashree Construction © 2011 All Rights Reserved