Home | Inquiry | Contact Us | Site map | Login
Projects Categories
Solar Power Plant
Cement Plant
Steel Plant
Power Plant
Sewage Treatment Plant
Packaging Plant
Institutional Work
Gas Compressor Stations
Industrial Projects
Infrastructure Work
Food Industry
Residential & Commercial Work
Earth Work
Inquiry Form
 
 
 
 
 
 
 
 
Photo Gallery
 
Air Port Hanger Floor 2.
PreHeater Tower Footing 1.
Earth Work (3).
High Rise Building Foundation Concreting Activity.
Air Port RCC Taxi Lane.
Industy Public Toilet.
PreHeater Tower Foundation Shuttering work.
Cement Plant (3).
College Display Unit 1.
Food Factory Building.
Machinery 3.
ZZZ.
College Building Workshop.
Solar Plant Finished Pile Foundation.
College Builing.
RCC Kiln Pier.
Cement Project under Construction (35).
High Rise Building Foundation.
Earth Work (4).
Pile Foundation for Solar Power Plant.
RCC Open and Shaded Stack Yard (3).
Cement Project under Construction (28).
Cement Project under Construction (47).
Solar Module Slab Foundation 2.
Industy Power Unit.
Solar Plant Slab Foundations.
Cement Project under Construction (7).
Machinery 6 (3).
RCC Silo Slab _View_Fish Eye Lense.
Earth Work.
Clinker Stockpile.
RCC Silo Slip Form Shuttering.
Solar Plant Slab Foundation Under Construction.
Water Network Junction.
Plant And Machinery.
Solar Plant CSS Foundation and Control Room.
College Main Gate and Landscape Circle.
Cement Project under Construction (24).
Solar Plant Control Room RCC Work.
Steel Plant Construction 3.
Solar Plant Control Room Slab Concreting.
Industrial Building (2).
Canteen (3).
College Building Laboratory Unit.
Making of Shuttering.
Muhurt At Solar Plant.
Solar Plant Pile Foundation under Construction (2).
College Building Laboratory Unit 4.
Fencing Work at Solar Plant.
Food Factory Building Flooring Work.
College Main Gate 2.
Auditorium (2).
Road Work Storm Water Drain and Street Light Foundations.
College Building Laboratory Unit 3.
Cement Project under Construction (4).
Food Factory Building Interior.
Earth Work (6).
Canteen (5).
Hydro Test Plant (2).
RCC Open and Shaded Stack Yard (2).
First Work.
Institutional Building Plaster Work.
Steel Plant Construction 2.
Cement Project under Construction (38).
RCC Silo Stagging work.
Cement Project under Construction (22).
Solar Plant Erected PV Panels on Structures.
College Building Main Campus Under Construction.
Cement Project under Construction (40).
GSB Work.
Cement Project under Construction (37).
Solar Plant (3).
Industrial Building Interior (4).
CCR Building and PreHeater Tower.
Industrial Building Interior (8).
Prestressed High Rise Building Foundation (2).
Cement Project under Construction (43).
Silo Fabrication Work.
Effluent Treatment Plant (4).
Residential Units.
Industrial Building Interior (10).
PreHeater Tower.
Concrete activity for Control Building at Solar Plant.
College Building Main Campus Skyline.
Industrial Factory under construction.
College Building Main Campus Interior Lab 3.
Industrial Building Interior (6).
Industrial Administration Building Corridor.
Cement Project under Construction (14).
College Building Main Campus Interior Lab 4.
Cement Mill House and Packing Plant.
College Night Life.
College Campus.
Solar Plant False Ceiling Work.
Computer Laboratory.
Control Room and Pipe Rack.
Earth Work (7).
Cement Silo Foundation.
Gujarat NRE Cock Open Stakyard Flooring.
Factory Building GSB and Earth Work.
RCC Silo and Preheater Tower.
Air Port RCC Apron 4.
Industrial Building Heavy Duty Vaccume Dewatered Trimix Factory Floor.
Solar Plant (1).
Hexagon Pattern.
College Building Main Campus and Lab Building.
Cement Project under Construction (30).
PreHeater Tower Foundation Work.
Plant and Machinery 1.
Machinery.
Heavy Foundation Reinforcement Work.
Sky Light in Main Campus Building.
College Building Workshop Shed.
Girls Hostel and Water Tank.
College Building Main Campus Spiral Stair Exposed.
Slipform Shuttering.
College Building Main Campus Class Room 2.
Efluent Treatment Plant.
Industrial Buildings Internal Shutters.
Silo Pumping_Concrete Activity.
PreHeater Tower Foundation Reinforcement Work.
College Library (2).
Air Port Hanger Back View.
Solar Plant Module Slab Foundation.
College Building Laboratory Unit 1.
PreHeater Tower Footing 2.
Solar Plant Slab Foundations (3).
Cement Project under Construction (1).
Factory Shed and Road Work.
RCC Silo Initial Stage.
Solar Plant RCC Slab Foundations.
Factory Entrance (1).
Solar Plant Fencing Work.
Machinery 2.
Earth Work (5).
Industrial Building.
Effluent Treatment Plant (1).
Food Insutry Factory Building.
Cement Project under Construction (21).
Solar Plant Slab Foundations for PV Modules.
Industrial Heavy Flooring.
PreHeater Tower Footing.
Solar Plant Modules.
Air Port Apron (Parking).
Air Port RCC Apron 2.
Cement Project under Construction (10).
Sewage Treatment Plant.
Cement Project under Construction (39).
Solar Plant Pile Foundations Under Construction.
Strom Drain HT Line Water Line Sewerage Line and Other Utilities.
Cement Plant.
Cement Project under Construction (46).
Solar Panel Installation Training At GERMI.
Parking (1).
College Building Main Campus Class Room 1.
CCR Building.
Air Port RCC Apron 1.
Industrial Buiilding Heavy Duty Floor.
Solar Plant Finished Pile Foundations (2).
Industrial Building Interior.
Gantry Girder and Columns.
Canteen (2).
Cement Silo Footing.
Solar Plant Module Slab Type Foundation.
Bike Assemble Buildin and Paint Booth.
Industrial Building Interior (7).
Industry building internal corridor.
Solar Plant Concreting Work.
Industrial Admin Building Corridor.
Cement Project under Construction (9).
PreHeater Tower Column Foundations.
College Campus (2).
Solar Plant Control Building Block Masonary.
College Building Main Campus Interior.
Surveying Instruments.
Effluent Treatment Plant (2).
Deshuttering of High Rise Heavy Slab.
Cement Project under Construction (49).
College Building Main Campus Waiting Room.
Solar Plant Foundations for PV Panels.
Cement Project under Construction (41).
Solar Plant Control Room.
Road Work_Utility.
Food Factory Building Work.
Solar Plant Concreting Work (2).
Oxygen Plant.
PreHeater Tower and RCC Silo.
Heavy Foundation Concreting Activity.
Cement Silo Under Construction.
Steel Plant Construction 4.
Industrial Shed Work.
Solar Plant Full View.
Solar Plant Slab Foundations (1).
Cement Mill Column Foundation.
Air Port RCC Apron 3.
Cement Project under Construction (26).
Workshop Building.
Solar Plant Finished Slab Foundations (2).
Machinery 6 (1).
High Rise Building Foundation Concreting Activity (2).
Air Port Apron 5.
College Building Main Campus 1.
Solar plant Finished Pile foundations (3).
Heavy Slab Stagging and Shuttering Work.
Preheater Tower Column Concreting.
Air Strip Runway.
Industrial Building Interior (11).
Solar Plant Pile Foundations.
Machinery 7.
Machinery (2).
RCC Silo Slab Reinforcement.
Cement Project under Construction (16).
Air Port Apron 6.
Cement Project under Construction (45).
Hostel Buildings Over Head Water Tank.
Solar Training at GERMI_Group Pic.
Cement Plant 1.
Weigh Bridge under Silo.
College Building Main Campus Interior 5.
Solar Plant CSS Foundations.
Mithapur Solar Plant.
College Building Main Campus Interior Lab 2.
PreHeater Tower RCC Silo.
Instititional Laboratory Building.
Canteen (1).
High Rise Building Foundation Concreting Activity (3).
Solar Plant Slab Foundations (4).
Road Work _GSB.
College Campus Water Body.
Solar Plant Pile Foundation Under Construction.
Steel Plant.
Solar Plant False Flooring.
College Building Main Campus Interior Fire Brick Work.
Cement Project under Construction (6).
PreHeater Tower Foundations.
Cement Plant (4).
Solar Plant (2).
Canteen (4).
Auditorium.
College Building Main Campus Side View.
Food Factory Flooring Work.
College Campus Land Scape.
Cement Project under Construction (3).
RCC Silo Slip Form.
Solar Plant Taking Shape (1).
Cement Project under Construction (2).
Road Work Sample.
Cement Silo and Cement Mill House.
Parking (2).
Cement Project under Construction (17).
Solar Plant Structure and Module Installation 1.
College Building Main Campus Back Yard and Display Unit.
Cement Plant (2).
Cement Project under Construction (36).
Cement Project under Construction (19).
Solar Plant Reinforcement Cages.
Kiln Pier Foundation (2).
Solar Plant CSS Foundation.
Flyash Silo Bottom Slab.
PreHeater Tower Foundation Reinforcement Work (2).
Oxygen and Spongeyarn Plant.
Cement Project under Construction (34).
Solar Plant Slab Foundations (2).
Laboratory Class Room.
College Building Workshop 2.
Bird's Eye View of Mehsana Hangar.
Cement Silo Wall.
Industy Public Toilet (2).
College Canteen.
RCC Silo Bottom Slab Reinforcement Work.
College Hostel Building.
Cement Project under Construction (25).
College Building Main Campus (2).
High Rise Buildng Top Slab Stagging and Shuttering.
RCC Silo Base Slab.
Gym.
Roof Top Solar System At GERMI Training.
PreStressed High Rise Building Foundation.
Fencing Work at solar plant (2).
Earth Work (8).
Kiln Pier and PreHeater Tower.
Inside View of Silo.
Cement Project under Construction (44).
Work Shop Building.
Cement Project under Construction (5).
Industrial Building Internal Corridor.
Solar Plant Under Construction.
Cement Project under Construction (48).
Earth Work (2).
Air Port Hanger.
Cement Project under Construction (18).
Solar Plant.
Cement Project under Construction (31).
Solar Plant Finished Slab Foundations.
Silo Bottom Slab and Slip Form Work.
Cement Packing Plant.
Factory Building Vaccum Dewatered Trimix Floor.
Slip form Shuttering.
Cement Project under Construction (32).
College Hostel Spiral Stair Case.
Preheater Raft Footing.
Factory Building Gantry Girder Columns and Pockets.
Solar Plant False Flooring and Ceiling Work.
Kiln Pier Foundation.
College Building Hanging Plane.
Cement Project under Construction (42).
Coal Stake Yard Flooring.
Industrial Building Interior (1).
College Building Workshop and Display Unit 1.
RCC Silo Footing.
Auditorium Stage (2).
Solar Plant Finished Pile Foundations (4).
Pre Stressed High Rise Building Foundation PCC and Reinforcement Work.
College Building Main Campus 2.
Sky Light in Boy's Hostel.
Stagging Material.
Steel Plant Construction 1.
Factory Entrance (2).
Solar Plant Finished Pile Foundations.
Auditorium Stage.
Land Scape.
College Building Main Campus.
Pile Drilling and Concerting Work at Solar Plant.
RCC Silo Starter Work.
Machinery 6 (2).
Industrial Building GSB and Earth Work.
Solar Plant Under Construction Full View.
Cement Project under Construction (23).
Industrial RCC Tank.
Cement Project under Construction (29).
Solar Plant Switch Yard Foundation.
Machinery 99.
PreHeater Tower RCC Silo Initial Stages.
College Display Unit 2.
Cement Project under Construction (27).
Steel Yard at Solar Plant.
Air Port Hanger RCC Floor.
College Library.
Work Shop Shade Under Construction.
Fly Ash Silo Bottom Slab and Columns.
College Building Main Campus Interior Lab.
FoothPath Sample.
Preheater Tower Column Foundation.
Air Port Hanger Building.
Cement Project under Construction (15).
College Building Workshop and display unit.
College Main Gate 1.
College Main Gate.
Earth Work (1).
Solar Module Slab Foundation 1.
College Main Gate Parking and Landscape.
Industrial Building Interior (3).
Solar Plant Taking Shape (2).
Paint Booth Industruial Unit.
Airport Hanger Apron Runway.
Solar Plant Structure and Module Installation.
Control Room.
RCC Open Stack Yard.
 
 
 
  Home  |  About Us  |  Projects |  Services | Career |  Contact Us  |  B-Con Profile  |  Inquiry  |  Photo Gallery  |  Sitemap  |  Login Designed By : Shah Net
  Bhagyashree Construction © 2011 All Rights Reserved